top of page

RIBEIRA D'ILHAD LIVING
ED. CABO DE SÃO VICENTE (Lote 9)

Etapas da obra
Fotos da Obra


Building entrance.jpg


Main facade.jpg


Flooring around the pool(1).jpg


Swimming pool.jpg


Pool equipment technical house.jpg


Painting of basement parking lot.jpg


Duplex stairs(1).jpg


Staircase painting.jpg


Staircase painting.jpg


Kitchen finishes.jpg


Common stairwell cabinet of electricity meters_.jpg


Bathtub assembly_.jpg


Installing shower screens.jpg


Water leak testing_.jpg


Bathtub assembly.jpg


Duplex stairs.jpg


Shelves in niches.jpg


Pavement exterior arrangements_.jpg


Pavement exterior arrangements_(1).jpg


Pool technical equipment.jpg


Railing of the access ramp to the garage.jpg


Installation of bathtub in duplexes.jpg


Flooring around the pool.jpg


open trench embankment at the entrance to the building.jpeg


Stone finishes on pillars.jpeg
bottom of page
